Portfolio

AES Brasil is a 100% renewable energy generator that has been investing in the country for nearly 25 years. It boasts a diversified portfolio, with a total of 5.2 GW of installed capacity, of which 4.5 GW are in operation and over 700 MW are under construction – including the Tucano (322 MW) and Cajuína 2 (370 MW) wind complexes, as well as the AGV VII solar farm (33 MW).

5,2GW

Installed Capacity

Ceará

Ceará

Mandacaru Wind Complex – 108 MW installed capacity

Comprised of Special Purpose Entities (SPEs) from the former MS and Santos wind complexes

100% contracted in the regulated market

Auction: LER 2009 (prior MS, until Jun/2032), and LEN 2011 (prior Santos, until Dec/2035)

Start of operations: 2014

Authorization end: 2045

Bahia

Bahia

Alto Sertão II Wind Complex – 386 MW installed capacity

100% contracted in the regulated market

Auction: LER 2010 (until Aug/2033) and LEN 2011 (until Dec/2035)

Start of operations: 2014 (LER 2010) and 2015 (LEN 2011)

Authorization end: 2046 (LER 2010) and 2047 (LEN 2011)

Bahia

Tucano Wind Complex – 322 MW installed capacity

Contracted in the non-regulated market through long-term PPAs (regular and self-production)

Average duration of the PPAs: 17.4 years

Estimated full operation start: 2S23

Authorization end: 2055

Rio Grande do Norte

Rio Grande do Norte

Salinas Wind Complex – 50 MW installed capacity

Comprised of Special Purpose Entities (SPEs) from the former MS Wind Complex

100% contracted in the regulated market

Auction: LER 2009 (until Jun/2032)

Start of operations: 2014

Authorization end: 2047

Rio Grande do Norte

Ventus Wind Complex – 187 MW installed capacity

100% contracted in the regulated market

Auction: LER 2009 (until Jun/2032)

Start of operations: 2014

Authorization end: 2045

Rio Grande do Norte

Cajuína Wind Complex – 314 MW installed capacity in operation (Cajuína 1) and 370 MW installed capacity under construction (Cajuína 2)

Contracted in the non-regulated market through long-term PPAs (regular and self-production)

Average duration of the PPAs: 17.4 years

Operation start (Cajuína 1): 2023

Estimated operation start (Cajuína 2): 1H24

Authorization end: 2055

Pernambuco

Pernambuco

Caetés Wind Complex – 182 MW installed capacity

100% contracted in the regulated market

Auction: LER 2013 (until Aug/2035)

Start of operations: 2016

Authorization end: 2049

São Paulo

São Paulo

Hydro – 2,658 MW installed capacity

Non-Regulated Market, 100% contracted for 2023 and 2024

12 Hydroelectric Power Plants (HPPs) and 3 Small Hydroelectric Power Plants (SHPPs)

Concession Expiry: 2032 (HPPs and SHPP Mogi) and 2036 (SHPPs São Joaquim and São José)

Tietê River Basin and Grande River Basin
São Paulo

Guaimbê Solar Complex – 150 MW installed capacity

100% contracted in the regulated market

Auction: LER 2014 (until Sep/2037)

Start of operations: 2018

Authorization end: 2050
São Paulo - Ouroeste Solar Complex – 145 MW installed capacity

Boa Hora (69 MW)

Água Vermelha (76 MW)

Boa Hora (69 MW):

100% contracted in the regulated market

Auction: LER 2015 (until Oct/2038)

Start of operations: 2019

Authorization end: 2051




Água Vermelha (76 MW):

100% contracted in the regulated market

Auction: LEN 2017 (until Dec/2040)

Start of operations: 2019

Authorization end: 2053

São Paulo

AGV VII Solar Complex – 33 MW installed capacity under construction

Non-Regulated Market

Estimated full operation start: 3Q24

Rio Grande do Sul

Rio Grande do Sul

Cassino Wind Complex – 64 MW installed capacity

100% contracted in the regulated market

Auction: LFA 2010 (until Dec/2034)

Start of operations: 2015

Authorization end: 2046

Piauí

Piauí

Complexo Eólico Ventos do Araripe – 210 MW de capacidade instalada

100% contratado no mercado regulado

Leilão: LER 2013 (até ago/2035)

Entrada em operação: 2015

Fim da Autorização: 2049
Ceará

Mandacaru Wind Complex – 108 MW installed capacity

Comprised of Special Purpose Entities (SPEs) from the former MS and Santos wind complexes

100% contracted in the regulated market

Auction: LER 2009 (prior MS, until Jun/2032), and LEN 2011 (prior Santos, until Dec/2035)

Start of operations: 2014

Authorization end: 2045

Bahia

Alto Sertão II Wind Complex – 386 MW installed capacity

100% contracted in the regulated market

Auction: LER 2010 (until Aug/2033) and LEN 2011 (until Dec/2035)

Start of operations: 2014 (LER 2010) and 2015 (LEN 2011)

Authorization end: 2046 (LER 2010) and 2047 (LEN 2011)

Bahia

Tucano Wind Complex – 322 MW installed capacity

Contracted in the non-regulated market through long-term PPAs (regular and self-production)

Average duration of the PPAs: 17.4 years

Estimated full operation start: 2S23

Authorization end: 2055

Rio Grande do Norte

Salinas Wind Complex – 50 MW installed capacity

Comprised of Special Purpose Entities (SPEs) from the former MS Wind Complex

100% contracted in the regulated market

Auction: LER 2009 (until Jun/2032)

Start of operations: 2014

Authorization end: 2047

Rio Grande do Norte

Ventus Wind Complex – 187 MW installed capacity

100% contracted in the regulated market

Auction: LER 2009 (until Jun/2032)

Start of operations: 2014

Authorization end: 2045

Rio Grande do Norte

Cajuína Wind Complex – 314 MW installed capacity in operation (Cajuína 1) and 370 MW installed capacity under construction (Cajuína 2)

Contracted in the non-regulated market through long-term PPAs (regular and self-production)

Average duration of the PPAs: 17.4 years

Operation start (Cajuína 1): 2023

Estimated operation start (Cajuína 2): 1H24

Authorization end: 2055

Pernambuco

Caetés Wind Complex – 182 MW installed capacity

100% contracted in the regulated market

Auction: LER 2013 (until Aug/2035)

Start of operations: 2016

Authorization end: 2049
São Paulo

Hydro – 2,658 MW installed capacity

Non-Regulated Market, 100% contracted for 2023 and 2024

12 Hydroelectric Power Plants (HPPs) and 3 Small Hydroelectric Power Plants (SHPPs)

Concession Expiry: 2032 (HPPs and SHPP Mogi) and 2036 (SHPPs São Joaquim and São José)

Tietê River Basin and Grande River Basin
São Paulo

Guaimbê Solar Complex – 150 MW installed capacity

100% contracted in the regulated market

Auction: LER 2014 (until Sep/2037)

Start of operations: 2018

Authorization end: 2050
São Paulo - Ouroeste Solar Complex – 145 MW installed capacity

Boa Hora (69 MW)

Água Vermelha (76 MW)

Boa Hora (69 MW):

100% contracted in the regulated market

Auction: LER 2015 (until Oct/2038)

Start of operations: 2019

Authorization end: 2051




Água Vermelha (76 MW):

100% contracted in the regulated market

Auction: LEN 2017 (until Dec/2040)

Start of operations: 2019

Authorization end: 2053

São Paulo

AGV VII Solar Complex – 33 MW installed capacity under construction

Non-Regulated Market

Estimated full operation start: 3Q24
Rio Grande do Sul

Cassino Wind Complex – 64 MW installed capacity

100% contracted in the regulated market

Auction: LFA 2010 (until Dec/2034)

Start of operations: 2015

Authorization end: 2046
Piauí

Complexo Eólico Ventos do Araripe – 210 MW de capacidade instalada

100% contratado no mercado regulado

Leilão: LER 2013 (até ago/2035)

Entrada em operação: 2015

Fim da Autorização: 2049